Case Study
Norwalk – Walk Bridge Replacement
Norwalk Connecticut
StoPanel RS Zinc ci by Jersey Panel Corporation
Client: Cianbro / AZ Corp / Cherry Hill Glass
Architect: HNTB
Consultant: WSP
Details
Norwalk Bridge Tower Machine Rooms
StoPanel RS Zinc ci prefab exterior wall panels
Scheduled to be installed September 2027
Project Info
The WALK Bridge Replacement Project in Norwalk, Connecticut, is a major infrastructure initiative led by the Connecticut Department of Transportation to replace the original 1896 four-track movable railroad bridge spanning the Norwalk River along the Metro-North New Haven Line and Northeast Corridor. The new structure features twin vertical lift spans with modern mechanical systems designed to improve reliability, increase navigational clearance, and enhance operational redundancy while maintaining active rail service during construction. As one of the busiest rail crossings in the United States, the bridge supports thousands of daily passenger movements between Boston, New York, and Washington, D.C., making this project critical to regional transportation stability, economic continuity, and long-term infrastructure resilience throughout the Northeast.
Client: City of Norwalk, Connecticut
Project Start: 2025
Project Type: Bridge Tower Machine Rooms
Architects: HNTB

Exterior Design
aperiam, eaque ipsa quae ab illo inventore veritatis et quasi architecto beatae vitae dicta sunt explicabo

Consulting Services
SELECTION OF STOPANEL PRODUCTS + SPECIFICATIONS

Project Management
At vero eos et accusamus et iusto odio dignissimos ducimus qui blanditiis praesentium voluptatum
Project Sustainability
- 90% Recycled Materials
- 60% Energy Self-Sufficient
- 20% Less Construction Waste
Other Projects
Environmental
Monarch Park
For City of San Francisco
Interior
Divi HQ Office
For Divi Inc.
Exterior
Extra Building
For Extra Co.
Let’s Build Something
Tell us about your proposed project